Why Choose Modular for Remote Living?

Building in regional Western Australia can present challenges that aren’t always experienced in metropolitan areas.

Distance, trade availability, unpredictable weather and limited access to infrastructure can all influence how a home is constructed.

With modular construction, much of your home is built at one of our Perth-based manufacturing facilities before being transported to your property for installation.

This offers several advantages for remote builds:

  • Reduced on-site construction: Much of the construction process takes place off-site, reducing the amount of work required at your property.
  • Quality-controlled manufacturing: Your home is constructed within a controlled environment, with dedicated supervision and quality checks.
  • Coordinated delivery: Our team plans transport, site access and installation requirements as part of the project.
  • Parallel construction: Where possible, site preparation and foundations can progress while your home is being manufactured.
  • Architectural flexibility: Choose from our range of contemporary modular designs or explore customisation options to suit your lifestyle.

Finding the Right Design

The Vista | Compact & Considered

2 bedrooms | 1 bathroom | 67m²

The Vista is a thoughtfully designed two-bedroom home that makes efficient use of its compact footprint.

With a contemporary exterior and functional living spaces, it’s an option for those seeking a regional retreat, downsized residence or smaller permanent home.

The Escape | A Place to Retreat

2 bedrooms | 1 bathroom | 63m²

Designed for relaxed living, The Escape offers a compact, practical layout suited to smaller households, rural retreats and ancillary accommodation.

Its single-module configuration makes it a design worth exploring for regional properties, subject to transport access and site suitability.

The Homestead | Country Living, Reimagined

3 bedrooms | 1.5 bathrooms | 108m²

Inspired by traditional country living, The Homestead combines a welcoming exterior with contemporary open-plan spaces.

With three bedrooms and a practical layout, it’s an appealing option for those seeking a permanent home on a rural or lifestyle property.

The Fernleigh | Modern Farmhouse Living

3 bedrooms | 2 bathrooms | 154m²

The Fernleigh brings timeless farmhouse architecture together with modern functionality.

Featuring light-filled living spaces and a considered floorplan, it’s designed for homeowners who want the character of country living without compromising on contemporary comfort.

Not sure which design suits your property? Our team can help you explore our full design range and discuss options for your land.

Prestart Prep - Plans
Architecture That Belongs
Designing a Home for Off-Grid Living

Off-grid living means creating a home that can operate independently of some or all traditional utility networks.

For properties without access to mains electricity, scheme water or sewerage infrastructure, alternative systems may be required.

At MIRA, we consider these requirements early in the planning process so your home’s design can accommodate the services needed for your property.

Prestart Prep - Plans

Your land. Your lifestyle. Your way of living.

Off-Grid Living Requirements

Solar Power & Battery Storage

For homes without access to the electricity grid, solar panels and battery storage can provide an alternative energy source.

System capacity will depend on your household’s energy consumption, location, seasonal conditions and appliance requirements.

Water Collection & Storage

Remote properties may rely on rainwater tanks, bore water or other approved water sources.

Planning for water storage, filtration, pressure systems and household consumption is an important part of preparing for off-grid living.

Wastewater Management

Where mains sewerage is unavailable, an approved on-site wastewater management system may be required.

The appropriate solution depends on soil conditions, local government requirements, site characteristics and household needs.

Energy-Efficient Design

A well-designed home can help reduce energy consumption and improve everyday comfort, particularly when relying on independent power systems.

Our modular homes incorporate double-glazed windows, insulation and thoughtfully considered layouts, with energy performance assessed against the applicable building requirements.

Window placement, orientation, shading and material selections can also play an important role in creating a comfortable home suited to your local climate.

compact modular studio home
The Dune Delivery Witchcliffe
Cowaramup Home

Off-Grid Success Stories

Case Study, Ferguson Valley

Luxury Farm Living

Bunbury Geographe

2 Beds 2 Baths 133m2
Read
Trusted Partners
Carpet Call
Clipsal Logo
Seima Logo
Stone Ambassador logo
Carpet Call
Clipsal Logo
Seima Logo
Stone Ambassador logo
Carpet Call
Clipsal Logo
Seima Logo
Stone Ambassador logo
The more you know

FAQs

Yes. Modular homes can be designed to accommodate off-grid living, including independent electricity, water and wastewater systems. The specific requirements depend on your property’s location, household needs and available infrastructure. Our team can discuss these considerations during the initial planning stages.

Off-grid services and infrastructure are assessed on a project-by-project basis. Speak with our team about your requirements so we can clarify what can be included in your building proposal and what may need to be arranged separately.

Yes. MIRA delivers modular homes throughout Western Australia, including regional and remote locations. Delivery feasibility depends on road access, transport requirements, module dimensions and site conditions.

Yes. Modular homes can be an option for farms, rural properties and lifestyle blocks, subject to the necessary site assessments and approvals. Our design range includes compact one- and two-bedroom homes through to larger family residences.

Yes, this can be an option depending on your property and local planning requirements. Some clients choose a smaller home initially while planning a larger family residence for the future. Any proposed future use of the original dwelling should be considered early in the planning process.

MIRA’s off-site manufacturing phase averages approximately 12 weeks, although this varies depending on the design and project requirements. The overall project timeline also includes planning, approvals, site preparation, transport, installation, service connections and handover.

Get in touch

Fill out the form below and transform the way you live with MIRA Residential.

Fields marked with * are required.

"*" indicates required fields

This field is hidden when viewing the form
Enquire Now