Yes, modular homes can be suitable for smaller metropolitan blocks, although site access and installation requirements are important considerations.
While a compact home may fit comfortably within your property’s boundaries, the surrounding street, overhead infrastructure and available installation space can influence whether the home can be delivered.
This is why we recommend discussing your block with our team before selecting a design.
For some properties, a smaller single-module home may offer a more straightforward installation solution. For others, additional planning or alternative installation methods may be required.
Every site is different, and our team can help you understand the available options.
Step 1: Initial Enquiry & Site Assessment
We begin by understanding your property, preferred home design and project requirements.
Our team reviews your block, including access, site conditions, planning considerations and potential delivery or installation constraints.
Step 2: Design & Personalisation
Once we’ve established the suitability of your property, we’ll help you explore our modular home designs and available personalisation options.
From architectural details and exterior finishes to internal fixtures and fittings, you’ll have the opportunity to make your home your own.
Step 3: Approvals & Project Planning
Our team coordinates the required building documentation, engineering and approvals.
We also plan the transport and installation requirements, including crane access, potential power line arrangements and other site-specific logistics.
Step 4: Off-Site Manufacturing
Your home is constructed at our Henderson manufacturing facility using precision-manufactured steel framing and a coordinated production process.
Where possible, site preparation and foundation works can progress at the same time.
Step 5: Transport & Installation
Once manufacturing is complete and the required inspections have been undertaken, your home is prepared for delivery.
Our team coordinates transportation and installation, including the necessary equipment, specialist contractors and approved access arrangements.
Each module is carefully positioned onto its engineered foundations before the remaining structural connections and finishing works are completed.
Step 6: Final Works & Handover
Following installation, the remaining connections, finishing works, inspections and commissioning are completed.
Once all required works and approvals are finalised, your new home is ready for handover.
At MIRA, we understand that building a home is about more than choosing a floorplan.
It’s about finding the right solution for your land, lifestyle and long-term needs.
Our experienced team combines architectural design, engineering expertise and off-site manufacturing to deliver high-quality modular homes across Perth and Western Australia.
From the initial site assessment through to transport, installation and final handover, we take a coordinated approach to every project.
With our manufacturing facility located in Henderson and our showroom and display home in Osborne Park, we’re proud to offer a locally based building experience.
Potentially. Overhead power lines can create restrictions for transporting and installing modular homes. Depending on the circumstances, arrangements with Western Power or other relevant service providers may be required. MIRA assesses these requirements during the project planning process.
Not always. Depending on the property and home configuration, MIRA may use cranes or hydraulic jacking systems to position the modules onto their engineered foundations. The installation method is determined by the specific requirements of your project.
Yes, provided the proposed design and installation method are suitable for the property. Narrow blocks may require additional consideration of access, setbacks, neighbouring structures and lifting requirements.
Yes. Modular construction can be suitable for knockdown rebuild projects in established Perth suburbs. Before proceeding, our team assesses the block, demolition requirements, site conditions and transport and installation feasibility.
Yes. MIRA coordinates the transport and installation of your modular home, including the necessary lifting equipment and specialist contractors. These requirements are considered when preparing your project-specific quote.
Installation costs vary depending on your block, the number and size of modules, site access, crane requirements and any additional works such as power line arrangements or traffic management. MIRA provides project-specific quotes to give you a clearer understanding of the overall costs involved.
Our off-site manufacturing phase averages approximately 12 weeks, although this varies depending on the design and project requirements. The overall project timeline also includes planning, approvals, site preparation, transport, installation and handover.
Yes. Permanent modular homes must comply with the same applicable National Construction Code and building approval requirements as traditionally constructed homes. The main difference is the construction method, with much of the home manufactured off-site before being installed at its final location.